CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Mirn Fauk
Country: Bulgaria
Language: English (Spanish)
Genre: Video
Published (Last): 22 January 2009
Pages: 496
PDF File Size: 6.2 Mb
ePub File Size: 20.92 Mb
ISBN: 720-3-37733-167-9
Downloads: 53501
Price: Free* [*Free Regsitration Required]
Uploader: Gogore

Untitled – Kerala PWD. High Level Bridge, Soriankuppam.

Schedule of rates and 30 Times for R. Main entrance hall plastic emulsion paint or the like. To change from Delhi base to future date in any place in India, the enclosed calculation sheet can be used to arrive at future cost index.

No part of this publication, either in English or in Hindi, may be reproduced in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission, in writing, from the Director General, CPWD, New Delhi.

  GALAMIAN VIOLIN METHOD PDF

Wed Mar 05, 5: Tue Mar 11, The difference between declared and estimated V. Arex, VI and above. Main Door Double door, one with iron grill with wire mesh mosquito proof and other 35 mm thick panelled shutter with hard wood style and rail with panelling of pre-laminated particle board, one side decorative other side balancing. Copy of Cost Indices West Bengal. Same as Type I to III except that panelling will be of both side decorative, pre-laminated particle board.

central pwd plinth area rates (1.10.2012) – CPWD

Last edited by amibrahim on Fri Mar 07, 1: Chennai CI Apr Up to six 06 Storeys, Floor ht 3. Light weight auto claved aerated concrete blocks. I am sure that this PAR will be very useful to all concerned.

In future, Preliminary Estimates may be prepared on the basis of these plinth area rates.

Before a plant is planted on a particular site, a soil test should be conducted t. Copy of Cost Indices Haryana Base C Internal — entrance hall, principals room, Committee room etc.

central pwd plinth area rates () – CPWD –

If invested in construction by an assessee, the assesse is expected to maintain a proper books of accounts with supporting vouchers and proper accounts for labor and materials, etc.

  INDICE GLUCEMICO Y CARGA GLUCEMICA PDF

Rates for items are applicable on entire plinth area except for items 1. Foundation Bearing capacity 10 tonnes per sq. Type —IV Foundation Bearing capacity 10 tonnes rares sq. Cable TV Point 1 1 2 2 – Same as Type I to III 35 mm thick panelled shutters with hard wood style and rail with panelling of pre laminated board, both sides decorative.

C Internal dry distemper in doctors room, operation theatre other important rooms, such as committee room, X-ray room etc.

Storage tank ltr. That calculation sheet has thirteen elements with Delhi local prices on and their weightage in that index.

D Skelton and subsequent order,issued by The weightage is prefixed as well as the prices. Open platform without parapets and terraces at ground floor and porches, shall not be included in the plinth area but shall be allowed for separately for costing purposes.

To enable packet tracing capabilities for packet sniffing and network fault isolation Rest either colour or white wash.